Uzbekistan has dropped its previous scheme for financing the modernization of 95 pumping stations because of sanctions against Russia and higher borrowing costs, Water Resources Minister Shavkat Khamraev said on Nov. 11.
Khamraev told a “Government Hour” session in the Legislative Chamber of the Oliy Majlis that the $37 million project would now be implemented with a new bank rather than with Russia.
“Because of the sanctions on Russia and rising interest rates on loans, we decided to implement the $37 million project not with Russia but with a new bank. The loan carries a 4% rate. That too will be implemented next year,” he said.
Implementation is now planned for 2027. Khamraev did not name the bank or give the final loan amount, repayment term or other conditions.
He was responding to Imomnazar Tursunov, an MP from the People’s Democratic Party of Uzbekistan, who pointed to delays in several of the ministry’s investment projects. “The table provided shows that not a single soum has been disbursed on these projects,” Tursunov said.
Separately, the session discussed a project to modernize 110 pumping stations with the European Bank for Reconstruction and Development, which agreed in 2025 to provide a loan of up to $250 million. Tender procedures were continuing in November 2026, the minister said, with completion planned for 2027-2028.
The 95-station project was originally to be financed with the participation of the Russian state development corporation VEB.RF. A presidential resolution signed on July 29, 2021, covered stations in Bukhara, Navoi, Kashkadarya, Samarkand and Surkhandarya provinces at an estimated cost of 213.5 million euros, including a 146 million-euro VEB.RF loan at 2% a year over 10 years. VEB.RF and the Ministry of Finance signed a loan agreement in September 2021.
The U.S. Treasury Department imposed blocking sanctions on VEB.RF on Feb. 22, 2022, and the resolution was repealed on Dec. 1, 2022. On June 18, 2026, the Ministry of Water Resources, the Eurasian Development Bank and the Eurasian Fund for Stabilization and Development signed a memorandum on preparing a water infrastructure modernization project covering 95 pumping stations in the same five provinces.
About 2.4 million hectares, or 56% of the country’s irrigated land, depends on pumped irrigation, the World Bank said.
Stay up to date with all the latest news: